Laboratório Nacional de Energia e Geologia Repositório Científico do LNEG
 

Repositório do LNEG >
ENERGIA >
Modelação e Optimização de Sistemas Energéticos - UMOSE >
UMOSE - Comunicações em actas de encontros científicos internacionais >

Please use this identifier to cite or link to this item: http://hdl.handle.net/10400.9/1411

Title: Short-Term scheduling of a polymer compounding plant
Authors: Castro, Pedro
Barbosa-Póvoa, Ana Paula
Matos, Henrique A.
Issue Date: 2002
Citation: Castro, P. ; Barbosa-Póvoa, A. P.; Matos, H. A. Short-Term scheduling of a polymer compounding plant. In: 12th European Symposium on Computer Aided Process Engineering, ESCAPE 12, 2002, p. 649-654
Abstract: This paper addresses the optimal short-term scheduling of a three parallel production line plymer compounding plant, whose equipments require cleaning between product changeovers. A very effective user-friendly software tool was developed, which consists of a general scheduling model coupled with capabilities of Microsoft Excel for data handling and analysis. The scheduling model is based on a Resource Task Network discrete time formulation and leads to Mixed Integer Linear Programming problems. As outputs the user can access the optimal schedules for a number of different objectives.
URI: http://hdl.handle.net/10400.9/1411
Appears in Collections:UMOSE - Comunicações em actas de encontros científicos internacionais

Files in This Item:

File Description SizeFormat
ESCAPE12.pdf164.31 kBAdobe PDFView/Open
Statistics
FacebookTwitterDeliciousLinkedInDiggGoogle BookmarksMySpaceOrkut
Formato BibTex mendeley Endnote Logotipo do DeGóis 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

  © Laboratório Nacional de Energia e Geologia, I.P. - Repositório Científico do LNEG - Feedback - Statistics
  Estamos no RCAAP Governo Português separator Ministério da Educação e Ciência

Implementado por:

KEEP Solutions, Lda.

Financiado por:

POS_C UE