Energia Solar - ES
Permanent URI for this community
Browse
Browsing Energia Solar - ES by Subject "Adsorption chiller"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
- The COOLSUN triple-technology approach to reach high solar fractions for space heating, space cooling and domestic hot waterPublication . Facão, Jorge; Lobato, António; Baldo, CatherineWithin the framework of the COOLSUN project a triple-technology approach to reach high solar fractions for space heating, space cooling and domestic hot water preparation is being developed. The three core components are a thermo fluid with a low environmental impact and a boiling point above 200 °C, a high efficient adsorption chiller, and an advanced controller. System simulations modelling the transient behaviour of the entire application, i.e. building, hot water preparation and space heating/cooling, show that for Mediterranean locations the solar fraction reaches values up to 100 %; and even in Central Europe remarkable energy savings can be reached. The first prototype of the system is installed since spring 2013 in a building and monitored under real operation conditions.
- The COOLSUN triple-technology approach to reach high solar fractions for space heating, space cooling and domestic hot waterPublication . Facão, Jorge; Lobato, António; Baldo, CatherineWithin the framework of the COOLSUN project a triple-technology approach to reach high solar fractions for space heating, space cooling and domestic hot water preparation is being developed. The three core components are a thermo fluid with a low environmental impact and a boiling point above 200 °C, a high efficient adsorption chiller, and an advanced controller. System simulations modelling the transient behaviour of the entire application, i.e. building, hot water preparation and space heating/cooling, show that for Mediterranean locations the solar fraction reaches values up to 100 %; and even in Central Europe remarkable energy savings can be reached. The first prototype of the system is installed since spring 2013 in a building and monitored under real operation conditions.