Logo do repositório
 
A carregar...
Miniatura
Publicação

CCS infrastructure development scenarios for the integrated Iberian Peninsula and Morocco energy system

Utilize este identificador para referenciar este registo.
Nome:Descrição:Tamanho:Formato: 
EnergyProcedia_37_2645.pdf120.78 KBAdobe PDF Ver/Abrir

Orientador(es)

Resumo(s)

This paper briefly illustrates a method to represent national energy systems and the geographical details of CCS infrastructures in the same technical-economic model. In the MARKAL-TIMES modeling framework a model of Morocco, Portugal and Spain with both spatial and temporal details has been implemented. As a function of assumptions on the development to 2050 of mitigation levels, economic growth and CO2 capture-transport storage characteristics, dozens of scenarios were prepared with the TIMES-COMET model. A few results on optimal levels of CCS contribution to mitigation compared to other energy system options are presented. The results also indicate the least cost lay out of the main capture, transport and storage infrastructures. It is concluded that the availability of CCS after 2020 will reduce the cost of mitigation in the Iberian Peninsula as soon as the EU GHG emissions reduction targets become more stringent than decided so far.

Descrição

Palavras-chave

Energy scenarios Climate change mitigation CO2 emissions MARKAL-TIMES GIS transport models Iberian Peninsula Morocco

Contexto Educativo

Citação

Kanudia, Amit; Berghout, Niels; Boavida, Dulce [et.al.]. CCS infrastructure development scenarios for the integrated Iberian Peninsula and Morocco energy system. In: Energy Procedia, 2013, Vol. 37, p. 2645-2656

Projetos de investigação

Unidades organizacionais

Fascículo

Editora

Elsevier

Licença CC