Publication
Sustainable use of geothermal resources in the Ribeira Grande geothermal field, São Miguel, Azores
dc.contributor.author | Franco, A. | |
dc.contributor.author | Ortolá, R. | |
dc.contributor.author | Ponte, C. | |
dc.contributor.author | Guimarães, T. | |
dc.date.accessioned | 2022-02-28T14:51:07Z | |
dc.date.available | 2022-02-28T14:51:07Z | |
dc.date.issued | 2020-08 | |
dc.description.abstract | ABSTRACT: The use of geothermal resources for power production on São Miguel Island has almost 40 years of accumulated experience. In the last decade, the stable power output from Pico Vermelho and Ribeira Grande geothermal plants have been providing up to 44% of the electricity needs of São Miguel Island. Throughout the history of the project, EDA RENOVÁVEIS has been carefully monitoring the Ribeira Grande reservoir conditions and well discharges to assess the resource response to the production load. The results from the last 10 years of monitoring data indicate that production did not cause any significant impact on the reservoir pressure or temperature and it can be maintained in the long-term without the risk of over-exploiting the geothermal resource. | pt_PT |
dc.description.abstract | RESUMO: O uso de recursos geotérmicos para produção de eletricidade na ilha de São Miguel tem quase 40 anos de experiência acumulada. Na última década, a estabilidade da produção das centrais geotérmicas do Pico Vermelho e da Ribeira Grande tem garantido até 44% das necessidades de energia elétrica da ilha de São Miguel. Ao longo da história do projeto, a EDA RENOVÁVEIS tem promovido a monitorização do reservatório geotérmico da Ribeira Grande, bem como dos parâmetros de produção dos poços geotérmicos, com vista a avaliar a resposta do recurso ao esforço de exploração. Os resultados dos últimos 10 anos de monitorização indicam que a exploração do recurso geotérmico não causou impacto significativo quer na pressão, quer na temperatura do reservatório, prevendo-se que esta poderá manter-se a longo prazo sem o risco de sobre-exploração do recurso geotérmico. | pt_PT |
dc.description.version | info:eu-repo/semantics/publishedVersion | pt_PT |
dc.identifier.citation | Franco et al. 2020, ‘Sustainable use of geothermal resources in the Ribeira Grande geothermal field, São Miguel, Azores’, Comunicações Geológicas, vol. 107, nº 1 (especial), pp. 93-96. | pt_PT |
dc.identifier.doi | https://doi.org/10.34637/a8h0-2m98 | |
dc.identifier.eissn | 1647-581X | |
dc.identifier.issn | 0873-948X | |
dc.identifier.uri | http://hdl.handle.net/10400.9/3775 | |
dc.language.iso | eng | pt_PT |
dc.peerreviewed | yes | pt_PT |
dc.publisher | LNEG - Laboratório Nacional de Energia e Geologia | pt_PT |
dc.relation.publisherversion | https://www.lneg.pt/wp-content/uploads/2020/09/20_Franco-et-al.pdf | pt_PT |
dc.rights.uri | http://creativecommons.org/licenses/by/4.0/ | pt_PT |
dc.subject | Geothermal energy | pt_PT |
dc.subject | Sustainable development | pt_PT |
dc.subject | Geothermal reservoir | pt_PT |
dc.subject | Ribeira Grande | pt_PT |
dc.subject | Energia geotérmica | pt_PT |
dc.subject | Desenvolvimento sustentável | pt_PT |
dc.subject | Reservatório geotérmico | pt_PT |
dc.title | Sustainable use of geothermal resources in the Ribeira Grande geothermal field, São Miguel, Azores | pt_PT |
dc.title.alternative | Aproveitamento sustentável de recursos geotérmicos no campo geotérmico da Ribeira Grande, São Miguel, Açores | pt_PT |
dc.type | journal article | |
dspace.entity.type | Publication | |
oaire.citation.conferencePlace | Amadora | pt_PT |
oaire.citation.endPage | 96 | pt_PT |
oaire.citation.issue | Fascículo especial I | pt_PT |
oaire.citation.startPage | 93 | pt_PT |
oaire.citation.title | Comunicações Geológicas | pt_PT |
oaire.citation.volume | 107 | pt_PT |
rcaap.rights | openAccess | pt_PT |
rcaap.type | article | pt_PT |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- sustainable-use-of-geothermal-resources-in-the-Ribeira-Grande.pdf
- Size:
- 4.31 MB
- Format:
- Adobe Portable Document Format