Name: | Description: | Size: | Format: | |
---|---|---|---|---|
152.82 KB | Adobe PDF |
Advisor(s)
Abstract(s)
The 2001/77/CE Renewable Energies European Directive together with Kyoto Protocol ratification supported by a government vision and strong objective on
the reduction of external oil dependence put Portugal in the front line to achieve one of the highest wind energy penetrations within 10 years$1 (B time. This paper gives
a summarized overview of the Portuguese technical approaches and methodologies followed in order to plan and accommodate the ambitious wind power goals to
2010/2013, preserving the overall quality of the power system.
Description
Keywords
High wind penetration Power system operation Wind power
Citation
Estanqueiro, Ana; Castro, Rui; Flores, Medeiros [et.al.]. How to Prepare a Power System for 15% Wind Energy Penetration: the Portuguese Case Study. In: Wind Energy, 2008, Vol. 11, nº 1, p. 75-84