Design and operation of power systems with large amounts of wind power: State of the art report

dc.contributor.authorHolttinen, Hannele
dc.contributor.authorLemstrom, Bettina
dc.contributor.authorMeibom, Peter
dc.contributor.authorBindner, Henrik
dc.contributor.authorOrths, Antje
dc.contributor.authorVan Hulle, Frans
dc.contributor.authorEnsslin, Cornel
dc.contributor.authorTiedemann, Albrecht
dc.contributor.authorHofmann, Lutz
dc.contributor.authorWinter, Wilhelm
dc.contributor.authorTuohy, Aidan
dc.contributor.authorO'Malley, Mark
dc.contributor.authorSmith, Paul
dc.contributor.authorPierik, Jan
dc.contributor.authorTande, John O.
dc.contributor.authorEstanqueiro, Ana
dc.contributor.authorRicardo, João
dc.contributor.authorGomez, Emilio
dc.contributor.authorSoder, Lennart
dc.contributor.authorStrbac, Goran
dc.contributor.authorShakoor, Anser
dc.contributor.authorSmith, J. Charles
dc.contributor.authorParsons, Brian
dc.contributor.authorMilligan, Michael
dc.contributor.authorWan, Yih H.
dc.date.accessioned2013-07-24T11:52:23Z
dc.date.available2013-07-24T11:52:23Z
dc.date.issued2007
dc.description.abstractHigh penetration of wind power has impacts that have to be managed through proper plant interconnection, integration, transmission planning, and system and market operations. This report is a summary of case studies addressing concerns about the impact of wind powers variability and uncertainty on power system reliability and costs. The case studies summarized in this report are not easy to compare due to different methodology and data used, as well as different assumptions on the interconnection capacity available. Integration costs of wind power need to be compared to something, like the production costs or market value of wind power, or integration cost of other production forms. There is also benefit when adding wind power to power systems: it reduces the total operating costs and emissions as wind replaces fossil fuels. Several issues that impact on the amount of wind power that can be integrated have been identified. Large balancing areas and aggregation benefits of large areas help in reducing the variability and forecast errors of wind power as well as help in pooling more cost effective balancing resources. System operation and working electricity markets at less than day-ahead time scales help reduce forecast errors of wind power. Transmission is the key to aggregation benefits, electricity markets and larger balancing areas. From the investigated studies it follows that at wind penetrations of up to 20% of gross demand (energy), system operating cost increases arising from wind variability and uncertainty amounted to about 14 /MWh. This is 10% or less of the wholesale value of the wind energy. With current technology, wind power plants can be designed to meet industry expectations such as riding through voltage dips, supplying reactive power to the system, controlling terminal voltage, and participating in system operation with output and ramp rate control. The cost of grid reinforcements due to wind power is very dependent on where the wind power plants are located relative to load and grid infrastructure. The grid reinforcement costs from studies in this report vary from 50 /kW to 160 /kW. The costs are not continuous; there can be single very high cost reinforcements, and there can also be differences in how the costs are allocated to wind power. Wind generation will also provide some additional load carrying capability to meet forecasted increases in system demand. This contribution can be up to 40% of installed capacity if wind power production at times of high load is high, and down to 5% in higher penetrations and if local wind characteristics correlate negatively with the system load profile. Aggregating larger areas benefits the capacity credit of wind power. State-of-the-art best practices so far include (i) capturing the smoothed out variability of wind power production time series for the geographic diversity assumed and utilising wind forecasting best practice for the uncertainty of wind power production (ii) examining wind variation in combination with load variations, coupled with actual historic utility load and load forecasts (iii) capturing system characteristics and response through operational simulations and modelling and (iv) examining actual costs independent of tariff design structure.por
dc.identifier.citationHolttinen, Hannele; Lemstrom, Bettina; Meibom, Peter; Bindner, Henrik; Orths, Antje; Van Hulle, Frans; Ensslin, Cornel; Tiedemann, Albrecht; Hofmann, Lutz; Winter, Wilhelm; Tuohy, Aidan; O'Malley, Mark; Smith, Paul; Pierik, Jan; Tande, John O.; Estanqueiro, Ana [et. al.]. Design and operation of power systems with large amounts of wind power: State of the art report. VTT Working Paper 82, IEA WIND Task 25. Espoo: VTT, 2007, 119 p.por
dc.identifier.isbn978-951-38-6633-4
dc.identifier.urihttp://hdl.handle.net/10400.9/1930
dc.language.isoengpor
dc.publisherVTTpor
dc.relation.publisherversionhttp://www.vtt.fi/vtt_show_record.jsp?target=julk&form=sdefe&search=56973por
dc.subjectWind powerpor
dc.subjectGrid integrationpor
dc.subjectReserve requirementspor
dc.subjectCapacity valuepor
dc.titleDesign and operation of power systems with large amounts of wind power: State of the art reportpor
dc.typebook
dspace.entity.typePublication
oaire.citation.conferencePlaceEspoo, Finlandpor
oaire.citation.titleDesign and operation of power systems with large amounts of wind power: State of the art reportpor
person.familyNameHolttinen
person.familyNameOrths
person.familyNameTuohy
person.familyNameEstanqueiro
person.givenNameHannele
person.givenNameAntje
person.givenNameAidan
person.givenNameAna
person.identifier.ciencia-id7F11-A24D-EE81
person.identifier.orcid0000-0003-1383-0735
person.identifier.orcid0000-0002-0876-9346
person.identifier.orcid0000-0001-9206-3495
person.identifier.orcid0000-0002-0476-2526
person.identifier.ridJ-9752-2012
person.identifier.scopus-author-id24759721100
person.identifier.scopus-author-id19336967700
rcaap.rightsopenAccesspor
rcaap.typebookpor
relation.isAuthorOfPublicationfad2fd6c-46ef-4859-8892-2b6d8ea3a9db
relation.isAuthorOfPublication0a9fb943-a558-4c60-bf0e-22e1e1612a6b
relation.isAuthorOfPublication78c06589-0519-421f-a5f6-43be4703ce63
relation.isAuthorOfPublication20aa31b3-fa3c-42b7-82a4-e6b91c017f9c
relation.isAuthorOfPublication.latestForDiscovery0a9fb943-a558-4c60-bf0e-22e1e1612a6b

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
ReportTask25_AEstanqueiro.pdf
Size:
3.15 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections