Publication
Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: a mathematical programming approach
dc.contributor.author | Gomes, Marta C. | |
dc.contributor.author | Barbosa-Póvoa, Ana Paula | |
dc.contributor.author | Novais, Augusto Q. | |
dc.date.accessioned | 2014-03-17T15:55:19Z | |
dc.date.available | 2014-03-17T15:55:19Z | |
dc.date.issued | 2013 | |
dc.description.abstract | A mixed-integer linear programming model is presented for the scheduling of flexible job shops, a production mode characteristic of make-to-order industries. Re-entrant process (multiple visits to the same machine group) and a final assembly stage are simultaneously considered in the model. The formulation uses a continuous time representation and optimises an objective function that is a weighted sum of order earliness, order tardiness and in-process inventory. An algorithm for predictive-reactive scheduling is derived from the proposed model to deal with the arrival of new orders. This is illustrated with a realistic example based on data from the mould making industry. Different reactive scheduling scenarios, ranging from unchanged schedule to full re-scheduling, are optimally generated for order insertion in a predictive schedule. Since choosing the most suitable scenario requires balancing criteria of scheduling efficiency and stability, measures of schedule changes were computed for each re-scheduling solution. The short computational times obtained are promising regarding future application of this approach in the manufacturing environment studied. | por |
dc.identifier.citation | Gomes, Marta C.; Barbosa-Póvoa, A.P.; Novais, Augusto Q. Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: a mathematical programming approach. In: International Journal of Production Research, 2013, Vol. 51, nº 17, p. 5120-5141 | por |
dc.identifier.issn | 0020-7543 | |
dc.identifier.uri | http://hdl.handle.net/10400.9/2323 | |
dc.language.iso | eng | por |
dc.publisher | Taylor & Francis | por |
dc.relation.publisherversion | http://dx.doi.org/10.1080/00207543.2013.793428 | por |
dc.subject | Reactive scheduling | por |
dc.subject | Flexible job shop | por |
dc.subject | Re-entrant process | por |
dc.subject | Assembly | por |
dc.subject | Mixed-integer linear program | por |
dc.title | Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: a mathematical programming approach | por |
dc.type | journal article | |
dspace.entity.type | Publication | |
oaire.citation.endPage | 5141 | por |
oaire.citation.startPage | 5120 | por |
oaire.citation.title | International Journal of Production Research | por |
oaire.citation.volume | 51 | por |
rcaap.rights | openAccess | por |
rcaap.type | article | por |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- InternationalJournalProductionResearch_Vol.51(17)_5120.pdf
- Size:
- 154.02 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: